The determination of existing noise levels in the area along the Eminönü-Alibeyköy tram line route, as well as the modeling of noise levels resulting from the operation of the tram and the assessment of its effects, has been carried out using numerical simulation methods. This process involved the parameters of the nearby roadways, rail systems, and other noise sources, buildings, and vehicles that will be used in the vicinity of the tram line to be operated.
The 3D model of the buildings surrounding Fener Station.
Height map of Cibali Station
Existing Condition Nighttime Grid Noise Map for Balat Station, dBA